At the moment, the HTM depot in The Hague is being converted to an electric connection, enabling fully emission-neutral operations. We have delivered an accessible procurement station for the 20kV connection from Stedin. This station accommodates both the grid connection and the medium-voltage (MS) connection for HTM.
The project was executed in collaboration with Siemens. Siemens installed their BlueGIS CleanAir NXplusC24 in the customer section. This is a medium-voltage installation from the new BlueGIS Portfolio, which means it does not use fluorinated gases and is maintenance-free.